Maaz Zindani

Loading the index…

↑↓ move↵ openesc close4072 pages

Buyer guide

C2C contractor or staff augmentation vendor: which should I engage?

In short

A C2C contractor is one person's company that you contract with directly. A staff augmentation vendor supplies people from a larger pool and carries the vendor's own contracts with them. Direct C2C gives you a named engineer and fewer layers. A vendor gives you volume and replacement. Compare what each puts in writing.

  • Written for founders and business owners
  • Updated
  • By Maaz Zindani, Senior Software Engineer

Who is this guide for?

Engineering leads and founders deciding whether to engage one contractor through their own company or to use a vendor that places people, and wanting the trade-offs laid out fairly.

What each one is

A C2C contractor is a company, often of one person, that sells that person's engineering work. You sign with the company and you deal with the engineer.

A staff augmentation vendor is a larger company that places engineers with clients. You sign with the vendor, which finds, contracts and often replaces the people.

Who you hold accountable

With one contractor, accountability is simple: the engineer and their company stand behind the work. There is no layer to relay messages through.

With a vendor, the vendor is accountable for supplying people under its contract, and the people are accountable to the vendor. That can help when a person leaves, and it can blur who owns a mistake.

Capacity and cover

One contractor is one person. If you need several engineers at once, or cover when someone is ill, one C2C contractor does not provide that, and a vendor may.

If you need one senior person who stays on the product, the pool of a vendor matters less than the person you meet.

Cost structure

A vendor's price usually includes its own margin and overhead. A contractor's price includes theirs. Compare the total for the scope, not a rate, and ask in each case what is and is not included.

Classification applies to both

Whichever you choose, the facts of the working relationship decide whether the person is an employee in the eyes of tax and labour authorities. The IRS guidance on the subject applies to a vendor's staff as well as to a contractor.

My own position

I am one senior engineer who contracts through my company, Stegnor LLC. I do not supply a team. If you need several engineers, I am the wrong answer to that part, and I will say so.

How do the options compare?

Direct C2C contractorStaff augmentation vendor
You sign withThe contractor's companyThe vendor
You deal withThe engineer directlyThe vendor, then the engineer
CapacityOne personA pool, if the vendor has one
Replacement if the person leavesYou start againThe vendor may supply another
Main thing to watchOne point of failureLayers between you and the work

What should I check before I sign?

  • You know how many engineers you really need.
  • You know who is accountable for the quality of the work.
  • You know what happens if the person becomes unavailable.
  • You compared total cost for the same scope.
  • You checked what each puts in writing.
  • You asked an accountant how classification applies.
  • You know who owns the code in each case.

How pricing works

I quote in writing after a short discovery call, against a written scope. Building an app from scratch? The app cost calculator gives a first range in two minutes.

What else do people ask?

Is C2C cheaper than a vendor?

It can be, because there is one fewer layer, but compare totals for the same scope. A lower rate with less scope is not cheaper.

Can a vendor supply C2C engineers?

Yes. Many do. Then you contract with the vendor, and the vendor contracts with the engineer's company.

Which is better for a long project?

It depends on whether you value one person who knows the product or the ability to swap people. Many teams use one senior person and add capacity when needed.

Does the choice affect who owns the code?

It can. Check that the chain of agreements assigns the work to you, whichever route you take.

Sources

How was this page made?

I drafted this page with AI assistance from the official documents listed under Sources. Found a mistake? Tell me.

How can we work this way together?

Next step

Want a written quote to compare?

A discovery call within 48 hours, then a scope and a price in writing.