The estimate I got is a huge range and I cannot plan around it
Short answer
A wide range usually means real unknowns remain. Do not ask for a narrower number to feel better: ask what is causing the width and which small piece of work would remove it. Then plan around the range with stages and a decision point.
Does this sound like your situation?
- I was given a range so wide it means nothing.
- My board wants one date and I cannot give one.
- The range has barely changed since the first quote.
- I do not know what drives the high end.
- I am being asked to commit before knowing the cost.
Why does this happen?
The work is not yet understood
Early in a project most of the uncertainty comes from things nobody has looked at yet. The range is honest about that.
One big unknown dominates
A single item, such as a third-party system you have not seen, can account for most of the spread.
Scope is still moving
If the request keeps changing, the range cannot narrow.
Nobody has done the investigation
A short look into the unknown part can cut the range sharply, but it has to be asked for.
What can I do about it today?
- Ask what widens the rangeAsk which two or three items cause most of the spread, in plain words.
- Ask for a short investigationRequest a small, bounded piece of work to remove the biggest unknown before committing.
- Fix the scope for nowAgree on what will not change until the next estimate.
- Plan with stagesBreak the project into stages with a decision after each, so you commit step by step.
- Tell your board the truthShare the range and the plan to narrow it. A false date will cost more later.
When should I bring someone in?
- The decision is large and irreversible and rests on a rough range.
- The range does not narrow after investigation.
- Different people give wildly different estimates for the same job.
How do I handle it?
- Find the main unknownsI identify which parts of the work cause the spread.
- Run a small investigationA short, bounded look at the riskiest part tests the assumption before anything big is committed.
- Re-estimate with evidenceThe range is updated with what was learned, and shown next to the previous one.
- Set decision pointsYou approve one stage at a time with a written scope.
- Keep it visibleYou get short updates on what changed in the range and why.
The price depends on what I find, so I quote in writing after a short discovery call. Tell me what is happening and I reply within 24 hours.
What do owners ask about this?
How narrow should an estimate be?
It depends on how well the work is understood. Early estimates are wide. They should narrow as the unknowns are resolved.
Can I get a fixed price instead?
Some work can be fixed once the scope is clear. If the scope is unclear, a fixed figure just moves the risk elsewhere.
Is a wide range a bad sign?
Not by itself. It is a bad sign if nobody can say what causes it or how to reduce it.